Luoyang Blue Energy Technology Development Co., Ltd. undertakes energy saving optimisation projects and PC turnkey projects for the heating furnace of a Sinopec Branch Company. The following problems existed in the heating furnace before renovation:
- High temperature of exhaust smoke.
- High temperature of the outer wall of the heating furnace.
- High oxygen content in the furnace chamber.
- Irregular operation of the heating furnace.
Calibrated by a third party agency, the thermal efficiency of the heating furnace before the transformation is 88%, combined with the actual status quo of the heating furnace, Lyblue Energy Technology Co. puts forward a practicable and comprehensive transformation plan, the overall goal of the expected transformation: the thermal efficiency of the heating furnace is not less than 92%.
After the on-site modification and calibration by a third-party agency, the thermal efficiency of the heating furnace was increased to 93.7%, far exceeding the expected target.